2010-09-11 / News

Inez bridge being replaced

Construction of a new bridge on Southwoods Road in the village of Inez will start on Monday. PennDOT’s work will require closure of Southwoods Road (T-306). A detour using Heth Road and Rt. 872 will be in place.

The open grate deck will be replaced with a concrete deck, with work expected to conclude around Oct. 15. Once the deck is in place, PennDOT will remove the 31-ton weight limit.

Return to top